Case Study

Critical Relocation of Ten White Oak Trees and Root Systems

Ten 200-Ton White Oak Trees Transported + Replanted — NessCampbell’s unique engineering experience, equipment, and expertise were critical in the relocation of ten white oak tree and root systems.

00:00
00:00

The Challenge

Coordinating the contractor with the engineering design and fabrication of the lifting system, taking special care of the requirements to maintain the health of the trees, in addition to the total lift weight of each tree — around 200-tons!

Image of a tree being loaded onto a trailer | Heavy Haul | NessCampbell

The Solution

NessCampbell’s engineering teams were critical in this multi-step operation, coordinating the transportation, operation, and safety of a 600-ton crane and two wide Goldhofer SPMT platform trailers.

Why NessCampbell?

NessCampbell’s engineering teams were critical in this multi-step operation, coordinating the transportation, operation, and safety of a 600-ton crane and two wide Goldhofer SPMT platform trailers.

A crane lifting a large pile of dirt at a construction site | Crane Rental Services | NessCampbell

The Outcome

Every tree we lifted, transported, and replanted survived and are thriving in their new location.

Equipment Used
  • 600 Ton Crane
  • Two wide Goldhofer SPMT platform trailers
  • Lots of Brains
Logistics + Services Used
  • Engineer
  • Lift
  • Haul

Get Started

Get Started